PHYSICAL MODEL STUDIES FOR STUDYING WAVE TRANQUILLITY ASPECTS INSIDE HARBOUR BASIN FOR DEVELOPMENT OF EASTERN BREAKWATER AND JETTY AT PORBANDAR, GUJARAT
The hydrological re-assessment involves evaluating water flow and flood risks for the 198 km new railway line project from Indore to Budhni in Madhya Pradesh, aimed at enhancing rail connectivity under the National Infrastructure Pipeline.
Geotechnical analysis to recommend measures for reducing seepage and enhancing stability of the Telewadi earthen dam, addressing safety concerns through soil and foundation assessments.
Geophysical surveys using seismic tomography and electrical resistivity to identify and map weak or distressed areas in the Kalwande Dam structure for targeted repairs.
Numerical modeling to assess structural integrity and safety of the pump house at the tailing dam of NMDC's iron ore beneficiation plant in Bacheli, Chhattisgarh.
In-situ permeability testing to evaluate foundation seepage risks and propose mitigation strategies for the Kadaknathwadi storage tank in Dharashiv district.
Mathematical modeling using HEC-RAS to determine hydraulic parameters for designing effective flood protection walls along the Tapi River in Surat to mitigate urban flooding.
Desk-based analysis for planning coastal protection structures at Dabhari Beach to prevent erosion and support tourism and industrial development in the Olpad taluka area.
Geotechnical evaluation to propose seepage control and stability enhancements for the Nive earthen dam, ensuring long-term safety through soil mechanics analysis.